My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: 110 W.TURNER RD <br /> Date of Testing/Servicing: t/28!08 <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory <br /> control. <br /> ❑ Check this box if no tank gauging or SIR equipment is <br /> This section must be Completed if in-tank �u <br /> installed. <br /> p gauging equipment is used to perform leak detection monitoring. <br /> Complete the followin cheMist: <br /> (8 Yes ❑ No** Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑ No Were all tank gauging probes visually inspected for damage and residue build ? <br /> 19 Yes ❑ No* Was accuracy of system product level readings tested? <br /> 0 Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ® Yes ❑ No* I Were all items on the equipment manufactu rer,s maintenance checklist completed? <br /> *1n the Section H,below,describe how and when these deficiencies were or wil!be corrected. <br /> G. Line Leak Detectors(LLD): ® Check this box if LLDs are not installed. <br /> COMBfete the followi8 checklist! <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑3 g.p.h.r; ❑0.I h.2 2 <br /> performance? <br /> Notes: 1. Required for Bua ❑02 g.. <br /> equipment start-up certification an annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> ❑ Yes ❑ No* Were al!LLDs confirmed operational and accuraDe within regtrlat <br /> ❑ Yes ❑ No* Was the testing apparatus proper!},calibrrated? on'requirements? <br /> ❑ Yes ❑ No• For mechanical LL n,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ NO For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 13 N/A <br /> ❑ Yes I QNo* For electronic LLDs,does the turbine automatically shut off if an <br /> C3 N/A <br /> or disconnected? y portion of the monitoring system is disabled <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if an <br /> 13N/A malfunctions or fails a test? Y portion of the monitoring system <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> r-1 NIA <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *1 the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H.Comments: <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.