Laserfiche WebLink
Ah <br /> ' a <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I <br /> TYPE OF ACTION ❑ I.NEW PLAN ® 2.CHANGE OF INFORMATION Mol <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moe. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) AT&T Corp. -CAK482 Moa. <br /> BUSINESS SITE ADDRESS J-1 10 West Turner Road M04. CITY Lodi Mos. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY Moe. ❑ 99.OTHER(Specify): M07. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location ofeach sensor,line leak <br /> detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification form,Hazardous <br /> Materials Business Plan map,etc.)which shows all required information,include it with this plan, <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mill <br /> ® I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.VACUUM Mil. <br /> PANEL MANUFACTURER: Veeder-Root M12. MODEL#: TLS-350 Plus M13. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root M14. MODEL#(S):794380-420 MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL,TANK(S) <br /> PANEL MANUFACTURER: M1e MODEL#: M17 <br /> IN-TANK PROBE MANUFACTURER: M18. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0-2 h. ❑ c.OTHER(Specify): M22.Mn <br /> g.p. g-p. P fY) <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25 <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): Mee. M27 <br /> ❑ 6.ViSUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requnesagencyapproval) <br /> ❑ 99.OTHER(Specify): M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.VACUUM M31 <br /> PANEL MANUFACTURER: Veeder-Root M32 MODEL#: TLS-350 Plus M33 <br /> LEAK SENSOR MANUFACTURER: Veeder-Root M34. MODEL#(S): 794380-208 Mas, <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ® b.NO Mia. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ® b.NO M37. <br /> ❑ 2. MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF PRODUCT FLOW <br /> WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): n43a. MODEL#(S): Mae <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p,h,LEAK TESTS <br /> ELLD MANUFACTURER: Moo. MODEL#: M41, <br /> PROGRAMMED IN LINE TESTING: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43, <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44 <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45 Moa <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY" ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- M42 <br /> •Requires agency approval `•Allowed for monnonng of unburied emergency generator fuel piping only per HSC.625281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> Mos. <br /> ❑ 99 OTHER(Specify) <br /> hwfwrc-d(9/24/04)-2/4 <br />