Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mso. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: M51. MODEL#: M52. <br /> LEAK SENSOR MANUFACTURER: MS3 MODEL#(S): M54, <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Ms6. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO MIT <br /> ❑ 2.MECHANICAL CONTINUOUS MONITORING(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> MANUFACTURER: M5a MODEL#(S): M59 <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY M60 <br /> ® 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST PERFORM ENHANCED LEAK M70 <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN,PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mao. <br /> I. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1,2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD(SWRCB)PUBLICATION:"HANDBOOK FOR TANK OWNERS-MANUAL AND STATISTICAL <br /> INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): Mal. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005,this facility will have a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code <br /> Council (ICC). By July 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST <br /> systems.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> A The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> SB989 secondary containment testing every 36 months <br /> Spill buckets are tested annually <br /> Overfill protection provided through drop tube flapper. <br /> Piping Trench—794380-420;North Sump-Tank Gauge Sensor 794380-208 <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF JANUARY 1,2005,THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION 111 OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> FACILITY FORM WILL. HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN TITLE 23 CCR§2715(c),AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE <br /> FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(c). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPERATOR SIGNATUR REPRESENTING DATE: M91 <br /> ®Owner M9o. <br /> _ ❑Operator February 29,2008 <br /> OWNER/OPERATOR NAME(print): M92. OWNER/OPERAT R TITLE: M93. <br /> 14 - ` w_ <br /> (Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions. <br /> Itwfwre-d(9/24/04)-3/4 <br />