Laserfiche WebLink
r i <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION <br />MM <br />PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />M02, <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) - - <br />BUSINESS NAME (Same as FACILITY NAME) AT&T Corp. - CAK482 <br />Moa <br />BUSINESS SITE ADDRESS J-110 West Turner Road Mn4. <br />CITY Lodi <br />Mos. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY Mos. ❑ 99. OTHER (Specify): M07. <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location ofeach sensor, line leak <br />detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification form, Hazardous <br />Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV" TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />n410. <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: ®a. DRY [Ib. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />MI I. <br />PANEL MANUFACTURER: Veeder-Root M1Z MODEL#: TLS -350 Plus <br />M13 <br />LEAK SENSOR MANUFACTURER: Veeder-Root M14.MODEL #(s): 794380-420 <br />MI5. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />M17 <br />PANEL MANUFACTURER: MI6 MODEL #: <br />IN -TANK PROBE MANUFACTURER: Mlx. MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20, <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />M21 <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): M22. M23 <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M2s <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />M2fi M27 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />❑ 6. VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency appmva4 <br />❑ 99. OTHER (Specify): <br />Mex. <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />M30. <br />® I. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ® a. DRY [Ib. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />M31. <br />PANEL MANUFACTURER: Veeder-Root M32. MODEL #: TLS -350 Plus <br />M33 <br />LEAK SENSOR MANUFACTURER: Veeder-Root M34. MODEL #(s): 794380-208 <br />M35, <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ❑ a. YES ® b. NO <br />Mas. <br />WILL FAILURE/DISCONNECTION OFTHE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ® b. NO <br />M37. <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RES'T'RICTS OR SHUTS OFF PRODUCT FLOW <br />WHEN A LEAK IS DETECTED <br />M3v <br />Msx. <br />MLLD MANUFACTURER(s): MODEL #(S): <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.13. LEAK TESTS <br />ELLD MANUFACTURER: M40. MODEL #: <br />M41. <br />PROGRAMMED IN LINE TESTING: ❑ a. MINIMUM MONTHLY 0.2h. ❑ b. MINIMUM ANNUAL 0, I h. <br />gP• gP <br />M42 <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M44 <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) M45 <br />Mas <br />❑ 5.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY'S ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* M47 <br />• Requires agency approval "Allowed for monitoring of unburied emergency generator fuel piping only per HSC §252x 1.5(6)(3) <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR §2636(x)(3) <br />❑ 7, NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />M4x. <br />❑ 99 OTHER (Specify) <br />hwfwrc-d (9/24/04) - 2/4 <br />