My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />4. <br />Page —2—of _2_ <br />TANK ANNULAR TESTING <br />Test Method Developed By: <br />❑ Tank Manufacturer ® Industry Standard D Professional Engineer <br />D Other (Specifi-) <br />Test Method Used: <br />D Pressure <br />D Other (Specify) <br />® Vacuum D Hydrostatic <br />Test Equipment Used: DIAL. GAUGE <br />Tank #DIESEL <br />Is Tank Exempt From Testing?' ® Yes ® No <br />Equipment Resolution: .05 <br />Tank # Tank # Tank # <br />D Yes D No D Yes D No D Yes D No <br />Tank Capacity: <br />15.000 GAL, <br />Tank Material: <br />STEEL / FIBERGLASS <br />Tank Manufacturer: <br />JOOR <br />Product Stored: <br />DIESEL <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 MIN <br />Test Start Time: <br />9:15AM <br />Initial Reading (Rj): <br />7.5" VAC <br />Test End Time: <br />10:15AM <br />Final Reading (RF): <br />7.5" VAC <br />Test Duration: <br />1 HR <br />Change in Reading (RF-Rj): <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 0 <br />0 <br />Test Result: <br />® Pass D Fail <br />D Paas D Fal! D Pass D Fail <br />D Pass D Fail <br />Was sensor removed for testing? <br />®Yes D No DNA <br />D Yes D No D NA D Yes D No D NA <br />D Yes ONO D NA <br />Was sensor properly replaced and <br />verified functional after testin IL— <br />®Yes D No DNA <br />D Yes D No D NA D Yes D No D NA <br />D Yes D No D NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up far failed tests) <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment. such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(x)(6)1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.