My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 49o.t <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs ATTHIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($1: <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agencv Use Only) i <br /> BUSINESS NAM (Same as FACILITY NAME) AT&T Corp. CAK482/LODICA02 ' <br /> ---__.-_-- --.___.--_-- -..-..__--- <br /> BUSINESS SITE ADDRESS J1 10 W TURNER RD LODI 104 <br /> IT.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must he performed at the frcqucncy <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must he performed by qualified personnel. <br /> X23 CCR 52632,2634^2638 2641)-_---------------------------_ <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490.34 <br /> Q ® pe Iy)� 490-36 <br /> IIT.MONITORING LOCATIONS ---'- �- <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL.ALARMS, (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49.6 <br /> ----------------------------•--------------- - ----- -_ --- - - ' r----- --------------- - ------ <br /> -- PANEL MANUFACTURER: VEEDER ROOTs9oa,- ------ I MODEL#: TLS-350 Plus 490=8 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794390420 490-I0 <br /> El 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 4'90-11 <br /> PANEL MANUFACTURER: ° 490-12. MODEL#: 490.13 <br /> ------- -. .....----------_----------------------------- - ---•- -------- -- -- --------- - -- ---- ----- - <br /> ------ <br /> IN-TANK PROBE MANUFACTURER: 490.14 MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY_ ❑ a.CONTINUOUS _ -- ❑ b.DAILY/NIGHTLY _ ❑ c WEEKLY 440.16 <br /> ❑ d.MONTHLY [] e.OTHER(Specify): 490.17 <br /> - ---- ----- ---- ---- .... <br /> --------------- --- ___----------- -- ---- -- --- - ___ __ _ <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): 490-I9 <br /> g P• g•P• 490•Iv <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTC)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS C14 <br /> b.60 HOURS 90.21 <br /> 90-zz <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY C] c,OTHER(Specify): 490-25 <br /> 49°.26 <br /> El99.OTHER (Specify): 490-27 <br /> __V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> L CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 4go-23 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER: 490.30 <br /> Veeder Root MODEL.#: TLS-350 Plus 490.31 <br /> 9 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 40.32 MODEL#---- 794380-208 490.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ®b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ®b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TES'T'S AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK 1S DETECTED2� 3 CCR 2636 �- 490-36 <br /> MLLD MANUFACTURER(S): g90.37 MODEL#(S): 44°-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-34 <br /> --_-_-------------- ------_. ------------- - - 1111 •- -MOD'----( :--------------._..- ----------..._..---,----- <br /> ELLD MANUFACTURER(S)-- -- 490 0--- I MODEL#(S): 4vo-0' <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMPSilUTDOWN. ❑a.YES ❑b.NO 493.43 <br /> ELLD FAILURE/DISCONNECTION"TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49'7.44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FRE UENCY El a.ANNUALLY b.EVERY 3 YEARS 0 c.OTHER(Specify) 490-46490-47 <br /> 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049 <br /> •Allov d for wnstonng of unbuned emerrency generator fuel piping mly pmr HSC 25261.5 b J <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 440.50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO TILE TANK SYSTEM <br /> 490.51 <br /> 99.OTHERS ci a9°-52 <br /> ❑ ( pe"fY) 49453 <br />
The URL can be used to link to this page
Your browser does not support the video tag.