My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:19 AM
Creation date
6/23/2020 6:51:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> UE231 P� <br /> UNIFIED PROGRAM CONSOLIDATED FORM MAY 2 4 2012 <br /> UNDERGROUND STORAGE TANK / <br /> MONITORING PLAN-(Page 1 of 2) :1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION NTAL HEALTH 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. PERM!T48-ERRAI W-E-8 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use O11v) - - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) AT&T Corp UE231/LODICA02 3. <br /> BUSINESS SITE ADDRESS 110 W TURNER RD#7 i°3. CITY LODI 104, <br /> 11.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> X23 CCR§2632,2634,2638,2641) <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY El99.OTHER(Specify): 490-3a <br /> 490.36 <br /> III.MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> --------------_- - - - - ------- - --- -- - -- -- -----* --- -- - <br /> --------------- ---------------------------------- <br /> PANEL MANUFACTURER: Veeder-Root 490-1. ! MODEL#: TLS-350 Plus 490-8 <br /> - ----------------------r------------------------------------------------------------------------- <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. 't MODEL#(S):(L2)794390420 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> --------------- ---- ---------------------- -- <br /> ----------- ------------------------------------------- <br /> ------------------------ ----------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> ------------------------------------------------------------------------------------------------ --- _-- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> ----- - ------- --------- --------------------- - - --- - ----- ---- -- - ------------------------------------------------------------ <br /> 490-18 TESTS: ❑ a.0.1 h. ❑ b.0.2 h. c.OTHER490-t8 <br /> g•P� g-P- ❑ (Specify): 490-t9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> 490-21 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-72 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY [3b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> a9a.z5 <br /> 490-2G <br /> ❑99.OTHER (Specify): <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-2g <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER:Veer-Root 490-30 ; MODEL#: TLS-354 Plus 490.31 <br /> --- - _ _ -- - - ------------------ _ - •--------- ------- ----------------------------- <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32 MODEL#(S).(L1)794384-208 490-33 <br /> ------- ---- -- - - -- -- ---------------------- ------------------------- - --- " - - --- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. M a,YES ®b.NO 490.34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES Elb.NO 490-35 <br /> Q 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.4 g.p h.LEAK TES'T'S AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2 ) 490-36 <br /> M'LLD MANUFACTURERS 490-37 MODEL#(S): 490-38 <br /> ❑" 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.4 g p:lc.LEAK TESTS (23 CCR§2636) 490-39 <br /> ___ ----- - -- - - --------------------- <br /> - ELLD MANUFACTURER(S)- - 490 az MODEL#(S). 490.41 <br /> --- _----- - -- -__ -- - ---- ----------------------------------- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. [] 2.MINIMUM ANNUAL 0.1 g.p.h. 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ❑' 4.PIPE INTEGRITY TESTING 490.4{ <br /> TEST FREQUENCY ❑ a,ANNUALLY ❑ b.EVERY 3 YEARS ❑ii c.OTHER(S eci ) 490-46 490.47 <br /> 5.VISUAL PIPE MONYFORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑", b.WEEKLY M c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED'- 490-49 <br /> Allowed for monitoring oflunburied-emergency generator fuel piping mly per HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)I 490.50 <br /> 01 7.NOREGULATEDPIPING PER HEALTH AND SAFE'T'Y CODE,DIVISION 29,CHAPTER 6.7IS CONNECTED TO THE TANK SYSTEM <br /> 490-51' <br /> ®! 99.OTHER(Specify)A 'onat monitoring systern i 490-ormadett can be found in Section X of this Monitoring Pian 490-435z <br /> ' <br /> UPCF UST-IY Rev.(1:212407) <br />
The URL can be used to link to this page
Your browser does not support the video tag.