My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_1986-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:04:10 PM
Creation date
6/23/2020 6:51:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1990
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_1986-1990.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />WE I S S \HAZMAT\MANULMOh`:-ITR <br />0 <br />Fr ' CT <br />2 S <br />PRQ��F 1989 <br />RR'^`'�T�S eft yE� <br />OVERFILL PROTECTION SYSTEM �R"jcFs ITy <br />-MANUAL MONITORING <br />r <br />Written Filling Procedure: <br />I. VISUAL MONITORING <br />Prior to delivery of fuels, a.visual monitoring of the <br />liquid level of the tank to be filled shall be <br />performed., <br />The station operator shall control the visual- <br />monitoririg.and filling of the tanks. <br />II. AVAILABLE TANK CAPACITY <br />The tank to be filled shall have an available capacity <br />of 103% of the load to be dropped into it*or the total <br />load plus 200 gallon capacity, whichever is less, as <br />determined by storage tank visual monitoring. <br />III. METERED INPUT <br />The load to be dropped into the underground tank shall <br />be.monitored either offsite by the batch plant into the <br />truck or onsite via a meter.on the truck into the <br />underground tank_•. <br />Signature: Ope <br />0I 9 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.