My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_1991-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:06:49 PM
Creation date
6/23/2020 6:51:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1994
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_1991-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br />DATE: October 7, 1994 <br />TO: Vince Padilla, Project Engineer <br />A & S Engineering, Inc. <br />49 Quail Court, STE. 303 <br />Walnut Creek, CA 94596 <br />FROM: Eric Trevena <br />PHS-EHD C(OPY <br />P.O. Box 2009 <br />Stockton, Ca 95201 <br />RE: 880 Victor Road, Lodi <br />I have reviewed the installation application submitted for the <br />above mentioned address. The following items must be addressed <br />prior to permit approval. <br />1. Please submit a written response plan according to section <br />2632 (d) (1) & (2) of the California Underground Storage Tank <br />Regulations. <br />2. How will the dispenser containment pan be monitored for the <br />presence of liquid? <br />3 A precision test is required after the tank system has been <br />completely installed and the station is operational. <br />4. The contractor information on page three of the installation <br />application needs to be completed. <br />5. The applicant needs to sign page three of the installation <br />plan. <br />If you have any questions regarding this matter please contact Eric <br />Trevena at (209) 468-0333. <br />
The URL can be used to link to this page
Your browser does not support the video tag.