Laserfiche WebLink
pCboq.. CO <br />STATE OFCAUFORt'pA � �e <br />STATE WATER RESOURCES CONTROL BOARD w °m <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. -Q = <br />MARK ONLY 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT <br />❑ <br />5 CHANGE OF INFORMATION <br />0 7 PERMANENTLY CLOSED ON SITE <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ <br />4 AMENDED PERMIT <br />❑ <br />6 TEMPORARY TANK CLOSURE <br />❑ 8 TANK REMOVED <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />GO q- — SerlA <br />E::]4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />tj--- Com'-TAk-Ttcwj <br />3 POLYVINYL CHLORIDE (PVC) A U 4 FIBERGLASS PIPE <br />1. TANK DESCRIPTION COMPLETE ALL ITEMS -- SPECIFY IF UNKNOWN <br />A. OWNER'S TANK I. D. # U0I<c il,W 0 <br />k. 1 <br />B. MANUFACTURED BY: Lj Iwo !.� <br />C. DATE INSTALLED (MO/DAY/YEAR) IN (A <br />D. TANK CAPACITY IN GALLONS: _ <br />IL TANK CONTENTS IFA -1 IS MARKED. COMPLETE ITEM C. <br />A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />B. <br />-PRODUCT <br />C. ❑ la REGULAR <br />6 AVIATION GAS <br />❑ 4 DIESELGASAHL ❑ <br />❑ 2 PETROLEUM ❑ 80 EMPTY <br />EL/ <br />�UPRE <br />NL MIU D ❑ 5 JET FUEL ❑ 7 METHANOL <br />❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. # <br />111_ TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A. R. AND C. AND ALL THAT APPLIES IN ROX D <br />A. TYPE OF <br />❑ 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br />[:j 99 OTHER <br />A U 2 DOUBLE WALL A U <br />F—]1 BARE STEEL <br />0 2 STAINLESS STEEL <br />F—]3 FIBERGLASS <br />E::]4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />B. TANK <br />3 POLYVINYL CHLORIDE (PVC) A U 4 FIBERGLASS PIPE <br />CORROSION <br />A U <br />5 ALUMINUM <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑7 ALUMINUM <br />❑ 8 100°/ METHANOL COMPATIBLE W/FRP <br />A U 10 CATHODIC PROTECTION <br />A& 95 UNKNOWN A U 99 OTHER <br />D. LEAK DETECTION <br />❑ <br />1 AUTOMATIC LINE LEAK <br />(Primary Tank) <br />0 9 BRONZE <br />E::]10 GALVANIZED STEEL <br />95 UNKNOWN <br />❑ 99 OTHER <br />MONITORING <br />0 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING <br />❑ 6 UNLINED <br />95 UNKNOWN <br />❑ 99 OTHER <br />LINING <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO <br />D. CORROSION <br />F-� 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />03 INYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />0 5 CATHODIC PROTECTION ❑ 91 NONE <br />95 UNKNOWN <br />❑ 99 OTHER <br />IV. PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND. BOTH IF APPLICABLE <br />A. SYSTEM TYPE <br />A U <br />1 SUCTION <br />A ®2 PRESSURE A U <br />3 GRAVITY A U99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U 2 DOUBLE WALL A U <br />3 LINED TRENCH A 095 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />A U <br />1 BARE STEEL <br />A U 2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC) A U 4 FIBERGLASS PIPE <br />CORROSION <br />A U <br />5 ALUMINUM <br />A U 6 CONCRETE A U <br />7 STEEL W/ COATING A U 8 100°/ METHANOL COMPATIBLE W/FRP <br />PROTECTION <br />A U <br />9 GALVANIZED STEEL <br />A U 10 CATHODIC PROTECTION <br />A& 95 UNKNOWN A U 99 OTHER <br />D. LEAK DETECTION <br />❑ <br />1 AUTOMATIC LINE LEAK <br />DETECTOR D 2 LINE TIGHTNESS TESTING 3 INTERSTITIAL g OTHER ;JOY -&10140 <br />0 <br />MONITORING <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />❑ 6 TANK TESTING '❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF SUBSTANCE REMAINING 3. WAS TANK FILLED WITH YES NO ❑ <br />Iuj. eckbwi L1► kAoWIJ GALLONS INERT MATERIAL? <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />APPLICANTS NAMEDATE <br />(PRINTED& SIGNATURE)R� 7M(5�LCA � GrS T ti/_ C�.,�� <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW T <br />COUNTY # JURISDICTION # FACILITY # TANK # <br />STATE I.D.# m 1❑ <br />PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br />FORM B (9.90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />FOR00348-144 <br />