My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_1991-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:06:49 PM
Creation date
6/23/2020 6:51:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1994
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_1991-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUAKTEF#� INVENTORY REPORTING <br />-�L/v ( S. <br />Facility Name 1 0 ady <br />Facility Address: ?90 <br />MR0 9, 0 No <br />'e <br />These were inventory variations that bg-�ertify that all product level variations <br />exceeded the allowable limits for thicE(VVI RONMENII t e above mentioned facility were <br />SE a <br />quarter. PERMIT/ allowable limits for this quarter. <br />OUT OF TOLERANCE <br />INVESTIGATIVE STEPS <br />Step I Review Records. <br />Step 2 New reconciliation <br />performed. <br />Step 3 Shell Oil notified. <br />Step 4 Records review from <br />F-ve,.yTA,,1C, the last stable <br />rA0etc-,g*_- situation. <br />,,j,r §fq# I., /Physical facilities <br />inspected for leaks. <br />Step 6 Dispenser meters <br />calibrated. <br />Step 7 Piping hydrostatically <br />tested. <br />Step 8 Underground storage <br />tanks precision tested. <br />Step 9 Additional investigation <br />as required by Shell <br />or the local agency. <br />This quarterly summary report <br />shall be submitted within 15 days <br />after the end of each quarter. Check <br />the quarter you are submitting <br />0 Quarter I — January thru March <br />Submit by April 15 <br />WQter 2 — April thru June <br />Submit by July 15 <br />0 Quarter 3 — July thru September <br />Submit by October 15 <br />El Quarter 4 — October thru December <br />Submit by January 15 <br />Send to (Local Agency): Z&Azf // <br />Z& zz <br />0&, <br />R YOUR RECORDS <br />7-ls-- fZ <br />DEALER'SIGNATURE DATE <br />IExplanation <br />OUT OF TOLERANCE <br />INVESTIGATIVE STEPS <br />Step I Review Records. <br />Step 2 New reconciliation <br />performed. <br />Step 3 Shell Oil notified. <br />Step 4 Records review from <br />F-ve,.yTA,,1C, the last stable <br />rA0etc-,g*_- situation. <br />,,j,r §fq# I., /Physical facilities <br />inspected for leaks. <br />Step 6 Dispenser meters <br />calibrated. <br />Step 7 Piping hydrostatically <br />tested. <br />Step 8 Underground storage <br />tanks precision tested. <br />Step 9 Additional investigation <br />as required by Shell <br />or the local agency. <br />This quarterly summary report <br />shall be submitted within 15 days <br />after the end of each quarter. Check <br />the quarter you are submitting <br />0 Quarter I — January thru March <br />Submit by April 15 <br />WQter 2 — April thru June <br />Submit by July 15 <br />0 Quarter 3 — July thru September <br />Submit by October 15 <br />El Quarter 4 — October thru December <br />Submit by January 15 <br />Send to (Local Agency): Z&Azf // <br />Z& zz <br />0&, <br />R YOUR RECORDS <br />7-ls-- fZ <br />DEALER'SIGNATURE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.