Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> .- s <br /> b. Tank/Piping Hauler <br /> Name F'f I b <br /> Address ��'l+? ( (Z- -�� - -city KV H MONO Zip `14 I <br /> Phone No.( 510 <br /> Hauler Registration#(if hanled as hazardous) <br /> c. <br /> TankiMping Disposal Site: <br /> Name Fa/ed <br /> Address S'' f�9 E LLP -QtY9Iah&N2 ZIP lq&21 <br /> Phone No 'C ?I o ) 2-.3pr2 1;3e-T-3 <br /> EPA D)#(if transported to a permitted TSD tadlity) OQ !I (', �- <br /> 9. is the sampling firm an independent third party from the contractor? NO[] <br /> 9a. Describe,in detail.how the soil andlor water sample(s)beneath the tank and piping wlll be obtained: <br /> ' <br /> VOW, B6-IAKIEP <br /> r� ® p <br /> " Q AJ 5 L' n A <br /> �'1 r--i�n oma- -�. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> WHal EsccA,\1knoi ,j IS IaTV=M r ier,) 2,E,6LL iT M LL E5F <br /> 11. Handling of excavated soil.' <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> V 15;aV CCN ELM I c, <br /> b)What will be the final destination of the excavated stockpile? <br /> 10 OG 2<- 1I�J <br /> c)Contaminated Soil Hazardous Waste Hauler <br /> Name :Lo [�-(E 2T t�LA I N Re on 0 <br /> Address City ZIP <br /> Phone No.L <br /> EH 23 046(Revised 10119198) Page 5 <br />