Laserfiche WebLink
MAR-18-99 THU 05:54 PH P. 04 <br /> BILU EXCAVATION CER TE <br /> Pmje=Location V Ott <br /> ..l�.•c�1.�.4 r ....�r.•..,o�ocGc, rPb= No. � 3 ► <br /> Couzracwr <br /> one No. tiff No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Sod Enginw,s Compaction Report within 30 days of project completion-or <br /> 2. Submiszj=of _ e.¢.. load ticket. within 30 days of project coupkdon dW ono of the following matcriais was <br /> placed iu ttze==vatiart in 12 rdh: <br /> _ A. pea gmvel--s rounded material not more titan one-half W-7) inch.in diameter <br /> B. Crushed rock-self trompacttag material not more tnaa :tete-qUarsers (3t4) usch M crt:ss sections! <br /> . (Use of crusted rock will not be pc==d for batidM if contact will be made between <br /> the backiM material sad taniWpipes mate of poly resin gjass or suudw -) <br /> DECLP►RATION <br /> I hereby certify that a Soil 's CoWacrlon Report will be mb=i=d writhe 30Xs of ect completion, or submission of <br /> verification drat the sd= mjuxiial described above vnil be placed at a M=mum of ade t tabic yards per 1000 gailon tank <br /> displacement acrd tM tae==excavacian w0 bc baakt3itsd and wmpacmd to Mum a with the Uniform Building Code <br /> A x tet 70. <br /> • ((.t1M <br /> -4amc slice <br /> far, <br /> " Shall be the respomble=ngwg employee on the license or wthorind agcut. <br />