Laserfiche WebLink
if QOj y, .�,.. .a.. ..sr <br /> ' - Precsurl2ed Line Leak De re $ <br /> e <br /> AU- MaTt:.ELF- <br /> 1. TROKi:UNE LEAK DE'i E--TOR <br /> Cet2l rt: Leak rate of 0,1 gph with Po=10CM.andLeakThree <br /> holes a.os Ph. A ieak is declared it the output at the <br /> epuats or=VedS this old. <br /> Iisitity` Gasotane,diose:,aviation fuel,and soiverts. <br /> SPS System tests P- urized Sibe arid steel pipelines. <br /> Tests are conducted at operating prcssure,not to e=eed SO osi <br /> System will ring lunation wan a m=hani=W fine J&U dete=r irtstalleci <br /> in the p*iine. <br /> Ftperme . eaty; Waximurn of 1QO gafioM <br /> Walting Tarte; •None between delivery and testing. - <br /> Minimum between dispensing acrd testing is Z M=u:s. <br /> Teri Period: Response time is 32-48 minutes, <br /> Test data are arr'a re=rded by a mirrapmoessor. <br /> tataulations;area lly performed by the ctisrrop :. <br /> S : Pesmartent'VMMUabm on pipelm <br /> Preset tVW4=W- <br /> S'rnpie test to detemtine if peffne is tealzing. <br /> 102=96 display and alarm ' n if ink is detected. <br /> E4WPmerd must be chw5wd annually and caBbratud if nec=mry in a=MW-„-e a -„-ewith <br /> manutecture-ft hztructions. , <br /> Testing of pipefirne at tale leak rate is nmmafly frifted rnanually,but may btt set zo <br /> au%MMf=Ry. <br /> v el RootEvahkaton Midwest.Research Insubm <br /> `23 Powder Fore4 Dr. Tei:(Ms) <br /> S' ury,r P CsaM20CM <br /> lea• {?A3y 8S a-27Q0 Date of Bvalua=OSMs/gs <br /> �► on ttais Is ata: be u6r!AS an ort ent <br /> by 2:av , U9"Cr MW is P.Any quWWUM or tray avr+o s of <br /> the Should be hXMW wit cpw=W ea=WrasW=vfith all ZPW=2b4 taw;.arae reguWiam <br /> P21R 30 197 16;02 =34 27D 5=1 PA :2 <br />