Laserfiche WebLink
TANX t3 NG <br /> The Underground "t nus it ( ). lab <br /> gyMIGNj is able to of a J=&in the pxixnary as well as secondary containment thmuZb the o <br /> f a <br /> Wet uid 11314 ora DU amular Wme and submuged liquid lowl wasor. ne s dzily <br /> log that cbarft &e operating Status of&a monitoringsystuL If a AhWM conditions oceurs, the deal"will call <br /> at S 7 ) °unmediately. Response to the alarmitoccur%ithin <br /> alarm24 hwtx. <br /> If the iti is NOT the result of an eVipmentR area Shell will repair ft tank system <br /> acoordance with ali local and state requirements. 1f the alarm con&tion is the molt of an equipment failure. Sbe11 <br /> equipmentwill repair the d ensu=that it is fnnetioning properly. <br /> MONITOMMO <br /> The g onatinuous monitorIng system is used at this facility: <br /> XoNAN Xj6iSLWV&&jL0TLNUDER350 FOR PRODUCT TANKS — <br /> The monitoring will be preformed an authorized el below. <br /> Mis monitoring eqvdpeuent shall,be inspected and cortifisd ly. Maintenance will be P 1y OF as <br /> i be°m amrdance to do manuiscluFers <br /> VISUAL MoNffoRWG of the jank MoWtordaily by the deWex ora designated employee. <br /> pleaseaawha site r&location o t and faims for keepiug monitoring recoob 89 the <br /> site- <br /> • °s . <br /> outlined 11. . <br /> Trainin will be <br /> t <br /> ® d o f electronic ®p ,W <br /> when Monitors,how to W a ®,lmw to perform inventory reconciliation, • g <br /> follow u event of slum activation,Ink,mupwteA leak,or offim.emergency. <br /> Tank upomars an trained an dle pCOpw operations,of am ° g equipment <br /> F LS "b1®f <br /> Has <br /> Aud%-Q=A Day 209-368-3755 <br /> 24hr 209-957-012 <br /> Jeffamberry Project 510-67S4145 <br /> Home 5106673-0753 <br /> Jeff oxk 510-675-61 <br /> Home 510-674-9413 <br /> Dan T. • 75-6168 <br /> How 51 2S <br /> See also a Piano <br /> LOOILO '110 -ribs OCTM90T9 XVd 6T=TT96/QT/TO <br />