My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_1995-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 3:55:50 PM
Creation date
6/23/2020 6:51:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-1999
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_1995-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ VEEDER-ROOT PRES RIZED LINE LEAK DETECTION <br /> 111111116111111111 <br /> SITE PREPARATION AND <br /> INSTALLATION INSTRUCTIONS • <br /> d. Disconnect the pipeline at the union closest to Since the SwiftCheckTM' valve replaces the existing <br /> the pump and remove existing plumbing between mechanical device, it is suitable in applications where <br /> the product pipeline and submersible pump. there is no sump. <br /> 3. You must observe the following guidelines when Follow these steps to install a SwiftCheck— valve in a <br /> installing the PLLD check valve: Red Jacket and Tokheim pump: <br /> a. The PLLD check valve is threaded for a 2"NPT 1. If the submersible turbine pump is equipped with a <br /> fitting at both ends. mechanical LLD, remove the mechanical unit and <br /> b. The PLLD check valve must be installed directly any related tubings and fittings. <br /> into the pump discharge port. 2. If the submersible turbine pump is not equipped with <br /> a mechanical LLD,remove the mechanical LLD port <br /> jc. The piston on the PLLD check valve must open plug(2"). <br /> in the direction of fuel flow(to the dispenser). 3. Ensure that the sealing surface for the valve's eater- <br /> 4. Install a 2" pipe tee directly onto the PLLD check nal o-ring is smooth and free from corrosion,pitting, <br /> valve(Figure 5). The tee provides a port for the Line and any material build-up(Figure 3). <br /> Leak Sensor and the product piping. It can be dp <br /> installed in any orientation, provided the Line Leak J <br /> CAUTION: FAILURE TO ENSURE A SMOOTH <br /> Sensor is not in-line with the pump outlet. SEAL SURFACE WILL RESULT IN FALSE LINE <br /> LEAK ALARMS! <br /> Ile` NOTE: The tee fitting must be installed directly <br /> onto the in-line check valve. <br /> n <br /> 5. A shutoff valve must be installed between the PLLD <br /> pipe tee and the product pipeline. <br /> s <br /> IIS NOTE: A shutoff valve is required to complete , <br /> the PLLD start-up procedure. <br /> 6. A dielectric union must be installed between the j I� <br /> PLLD check valve and metal piping. A standard <br /> union may be used if the piping is fiberglass. SEALING SURFACE <br /> 7. It is strongly recommended that a flexible piping ele- \ OF PUMP PORT <br /> ment be used to complete the connection to the prod- <br /> uct pipeline. <br /> 8. Seal all joints with a UL-classified nontoxic pipe <br /> sealant that meets all national, state and local codes. <br /> CAUTION: DO NOT USE EXCESSIVE <br /> AMOUNTS OF SEALANT ON THE CHECK <br /> VALVE THREADS OR MATING FITTINGS. EX- j <br /> CESSIVE SEALANT COULD CAUSE CHECK <br /> VALVE FAILURE. <br /> Sealing 3. <br /> 9. Do not install piping exiting the PLLD Check Valve Figure g Surface for SwiftCheck Valve's <br /> higher than the pump discharge port. This configura- I External O-Ring <br /> tion creates an area which can collect air. 4. Install the SwiftCheck'"' valve (Figure 4) in the <br /> C. SWIFTCHECK`*m VALVE INSTALLATION <br /> (FOR RED JACKET AND TOKIEIM PUMPS). 11b-`mechanical LLD pump port. <br /> NOTE: Seal the NPT threads only with a UL <br /> The SwiftCheck-valve mounts directly into the mechan- <br /> classified nontoxic pipe sealant. <br /> ical line leak detector pump port.It eliminates the need to <br /> break product lines for installation and service. It also D. LINE LEAK SENSOR INSTALLATION <br /> Cda means of precision testing on the main pump <br /> head O-ring and threaded discharge. To install the Line Leak Sensor: <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.