Laserfiche WebLink
{ VEEDER-ROOT PRES RIZED LINE LEAK DETECTION <br /> 111111116111111111 <br /> SITE PREPARATION AND <br /> INSTALLATION INSTRUCTIONS • <br /> d. Disconnect the pipeline at the union closest to Since the SwiftCheckTM' valve replaces the existing <br /> the pump and remove existing plumbing between mechanical device, it is suitable in applications where <br /> the product pipeline and submersible pump. there is no sump. <br /> 3. You must observe the following guidelines when Follow these steps to install a SwiftCheck— valve in a <br /> installing the PLLD check valve: Red Jacket and Tokheim pump: <br /> a. The PLLD check valve is threaded for a 2"NPT 1. If the submersible turbine pump is equipped with a <br /> fitting at both ends. mechanical LLD, remove the mechanical unit and <br /> b. The PLLD check valve must be installed directly any related tubings and fittings. <br /> into the pump discharge port. 2. If the submersible turbine pump is not equipped with <br /> a mechanical LLD,remove the mechanical LLD port <br /> jc. The piston on the PLLD check valve must open plug(2"). <br /> in the direction of fuel flow(to the dispenser). 3. Ensure that the sealing surface for the valve's eater- <br /> 4. Install a 2" pipe tee directly onto the PLLD check nal o-ring is smooth and free from corrosion,pitting, <br /> valve(Figure 5). The tee provides a port for the Line and any material build-up(Figure 3). <br /> Leak Sensor and the product piping. It can be dp <br /> installed in any orientation, provided the Line Leak J <br /> CAUTION: FAILURE TO ENSURE A SMOOTH <br /> Sensor is not in-line with the pump outlet. SEAL SURFACE WILL RESULT IN FALSE LINE <br /> LEAK ALARMS! <br /> Ile` NOTE: The tee fitting must be installed directly <br /> onto the in-line check valve. <br /> n <br /> 5. A shutoff valve must be installed between the PLLD <br /> pipe tee and the product pipeline. <br /> s <br /> IIS NOTE: A shutoff valve is required to complete , <br /> the PLLD start-up procedure. <br /> 6. A dielectric union must be installed between the j I� <br /> PLLD check valve and metal piping. A standard <br /> union may be used if the piping is fiberglass. SEALING SURFACE <br /> 7. It is strongly recommended that a flexible piping ele- \ OF PUMP PORT <br /> ment be used to complete the connection to the prod- <br /> uct pipeline. <br /> 8. Seal all joints with a UL-classified nontoxic pipe <br /> sealant that meets all national, state and local codes. <br /> CAUTION: DO NOT USE EXCESSIVE <br /> AMOUNTS OF SEALANT ON THE CHECK <br /> VALVE THREADS OR MATING FITTINGS. EX- j <br /> CESSIVE SEALANT COULD CAUSE CHECK <br /> VALVE FAILURE. <br /> Sealing 3. <br /> 9. Do not install piping exiting the PLLD Check Valve Figure g Surface for SwiftCheck Valve's <br /> higher than the pump discharge port. This configura- I External O-Ring <br /> tion creates an area which can collect air. 4. Install the SwiftCheck'"' valve (Figure 4) in the <br /> C. SWIFTCHECK`*m VALVE INSTALLATION <br /> (FOR RED JACKET AND TOKIEIM PUMPS). 11b-`mechanical LLD pump port. <br /> NOTE: Seal the NPT threads only with a UL <br /> The SwiftCheck-valve mounts directly into the mechan- <br /> classified nontoxic pipe sealant. <br /> ical line leak detector pump port.It eliminates the need to <br /> break product lines for installation and service. It also D. LINE LEAK SENSOR INSTALLATION <br /> Cda means of precision testing on the main pump <br /> head O-ring and threaded discharge. To install the Line Leak Sensor: <br /> 9 <br />