My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 3:59:11 PM
Creation date
6/23/2020 6:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2003
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2000-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTI 1 ♦ Secondary Contain ent ping System Components <br />d. If solvent is used to clean bonding surfaces, allow <br />the cleaner to evaporate. Then apply adhesive to <br />all bonding surfaces, and insert the nipple into the <br />line by lifting the line or moving it to one side. <br />Pushing the pipe back into the line will push the <br />nipple into the bell. Make certain that all tapers <br />are tightly locked. Be careful not to cock the joint. <br />1.8.4 Leaking Joints <br />Any adhesive -bonded joints that leak during pressure test- <br />ing MUST BE REMOVED AND REPLACED. Follow the <br />procedures shown for Fig. 1.8.6 using two sleeve couplings <br />and pipe nipple. <br />Upon completing any necessary repairs to the piping sys- <br />tem, follow the proper testing sequence to verify the sys- <br />tem's integrity. <br />PART TWO • SECONDARY CONTAINMENT PIPING <br />INTRODUCTION <br />Before beginning any installation, it is important that <br />all crew members read and be familiar with the instal- <br />lation procedures described in this manual. <br />The secondary containment piping system is designed for <br />use with RED THREAD IIA product pipe. The secondary <br />containment system consists of the next larger size pipe <br />and special two-piece fittings. Smith Fiberglass Products <br />also offers a patented(') telescoping containment pipe sys- <br />tem that allows 100% inspection of primary piping (refer <br />to Part Three). <br />Many of the procedures used for installing product <br />pipe and fittings are also used for installing secondary <br />containment pipe and fittings. Refer to Part One for <br />installation instructions for product pipe and fittings <br />and to Bulletin No. F6600 for tapering tool operating <br />instructions. <br />Following are useful sections of Part One: <br />Section 1 - Storage and Handling <br />Section 2 - Layout and Preparation <br />Section 3 - Tool and Equipment List <br />Note: For installation of bolts, use one of the following: <br />1. X" variable impact wrench with X" socket <br />2. %" variable speed drill motor with X" socket <br />3. One %" wrench <br />For installing saddles, the following equipment is recom- <br />mended: <br />1. Sanding equipment <br />a. power sander with rough surface sanding disc (flex- <br />ible pad with 40 grit or less disc), or <br />b. hand file (coarse) <br />2. Fine-tooth circular hole saw with pilot drill <br />3. Hose clamps or Band-It(2) banding tool large enough to <br />secure saddles to pipe. (If banding is used, the Band -It <br />banding tool is preferred, because this tool does not <br />leave slack in the band when the tool is removed. Two <br />Band -It tools are recommended so that the saddle can <br />be pulled down uniformly. Use %" (19 mm) banding. <br />Section 5 - Cutting and Tapering (cutting) <br />Section 6 - Installation (piping layout and trench design; <br />adhesive mixing and curing) <br />AIN ENT PIPING SYSTEM <br />Containment Pipe <br />fi-Tiberglass Products secondary containment piping <br />are as follows: <br />Containment Pipe Size For Product Pipe Size <br />3" €.75 mm: 2" 50 r <br />4" 1:�0 znm 311 <br />6"(3) 150) mm, 4" 1001 I <br />2.1.2 Secondary Containment Fittings <br />Available secondary containment fittings are tees, 90° el- <br />bows, 45' elbows, couplings, nipples, termination fittings <br />(with or without %" NPT threaded outlet), and saddles <br />(belled or with NPT threaded outlets). <br />2.1.3 Adhesive for Secondary Containment Piping <br />For petroleum products, alcohols, and alcohol/gasoline <br />mixtures, use DS -8000 or DS -7000 series adhesive for in- <br />stalling secondary containment piping systems. When <br />joining secondary containment pipe -to -fittings and fit- <br />tings -to -fittings, fiberglass filler must be added to the <br />adhesive to ensure optimum performance of this type <br />of bonded joint. Filler must be ordered from Smith <br />Fiberglass Products. Due to the quantity of adhesive re - <br />(1) U.S. Patent No. 4,805,444 (3) Note: 6" (150 mm) secondary containment pipe is not UL Listed. <br />(2) Band -It Banding Tool available from Band -It Idex, Inc., P.O. Box 16307, <br />4799 Dahlia St., Denver, CO 80216, 303-320-4555. <br />RED THREAD 11A Pipe br Fittings P. 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.