My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 3:59:11 PM
Creation date
6/23/2020 6:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2003
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2000-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buoyant forces are parte . resisted by the <br />weight of the tank, the backfill and the pavement <br />atop the tank. Additional buoyant restraint when <br />required, shall be obtained by using properly <br />designed hold-down straps in conjunction with <br />concrete hold-down pads or deadman anchors. <br />The use of steel cable or round bar as hold- <br />down straps on the tank is prohibited. <br />NOW dam elr*v <br />endued be Swanod <br />ftm ft .n <br />Mort ko <br />dtatenWe afafergl. ' <br />6.3 Whe allasting the tank, ballast level inside the <br />tank must never exceed the water level, or <br />backfill level, in the excavation during <br />installation. <br />7.1 <br />5.2 Installers of hold-down straps shall ensure that <br />the straps are separated from the tank by a pad <br />made of inert insulating d"reiectric material, The <br />separating pad shall be wider than the hold- <br />down straps, which will prevent direct contact <br />between the straps and the tank shell. <br />7.2 <br />5.3 Ballasting the tank may be necessary. When <br />water is used as the ballast material, it shall only <br />be potable water and shall not remain In the tank <br />longer that 60 days. ' <br />6.0 BACKFILLING <br />619 Homogeneous backfill material similar to the <br />bedding material shall be Carefully placed around <br />the entire tank to create a uniform homogeneous <br />environment. Avoid damage to laminate <br />especially where tamping is required. <br />6.2 Installing and tamping backfill along the bottom <br />sides of the tank shall ensure that the tank Is <br />fully and evenly supported around the bottom <br />quadrant. <br />FINAL AIR TEST <br />Install required tank piping using compatible non - <br />hardening sealant, taking care not to cross <br />thread or damage the nylon bushings. Torque of <br />400 to 1,044 ft -lbs (542.3 to 1355.82 N -m.) shall <br />be required to fully insert pipe. <br />Where air or hydrostatic testing is required after <br />installation, the pressure applied shall not be in <br />excess of 5 psi (34.5 kPa) as measured at the <br />top of the tank. A soap solution shall be applied <br />around pipe connections while sir test is being <br />performed. <br />8.0 ELECTRICAL ISOLATION <br />8.1 All openings shall be Isolated where electrical <br />accessories will be installed such as submersible <br />pump, monitoring equipment and all other, <br />grounded electrical devices. <br />8.2 Prior to backfilling to top of tank, all opentr O <br />shall be visually inspected to assure that the di- <br />electric isolation (nylon bushings orftange•. <br />gaskets), where Pumished, remains in place. <br />Where flanged openings have been used, -'- <br />Isolation of the flange gaskets shall be confirmed <br />with a continuity tester. Cnntnnt with tha tflnle <br />
The URL can be used to link to this page
Your browser does not support the video tag.