Laserfiche WebLink
P. 6 <br />8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />L` /1 <br />6:4 arcy y <br />b. Tank/Piping Hauler. <br />Names 1011— C-1.. <br />Address S� �� 2 91yb _ City..._ i C Ja,' 1 zip <br />PhoneNo.LP-12- il _ 7i! �_" /W <br />Hauler Registration # (it hauled as hazardous) g <br />c. Tank/Piping Disposal Site: <br />Name G . <br />Address ZSR ���?�z 5/ Vb , City /21e� Dey up 9YlL <br />Phone No.LaO ) Z35-- / �? V? <br />TEPA ID# (if transported to a permitted TSD facility) q Y/,O <br />9. Is the sampling firman Independent third party from the contractor? YES NO ( J <br />.9a. Describe, in defall, how the soli and/or water samples) beneath the tank and piping will be obtained: <br />, <br />®sem .Q C®c)�rc1;L.. <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />FQIV AV0 rll <br />c) Contaminated Sall Hazardous Waste Hauler. <br />Name / t7 R j�(j � Hauler Registration # <br />Address <br />Phone No. ( ) <br />City Zip <br />M 23 046 (Revised 0$113199) Page 5 <br />6 /�,w A <br />