Laserfiche WebLink
8. <br />a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />50 r .�, Qr DR) ' /CSC C!? 1000 a4z4 AJ5 ojF 7" <br />EACH Y <br />b. TanklPiping Hauler. <br />r.� AE <br />Address PARA 131 -VO, _City <br />. 0 Zip 9!4801 <br />r ar <br />I' h I` <br />Hauler Registration # (if hauled as hazardous) / <br />C. Tank/Piping Disposal Site: <br />Name L- C / <br />Address Z675 P,4R� 61-YA City /C1i170D ZIP 9Afgol <br />Phone No.( _5-®0 ) ?-35'-/373 <br />SPA Mf (if transported to a permitted TSD facility) 4-69 00246U92 - <br />9. <br />a 9 <br />9. Is the sampling firm an independent third party from the contractor? YES e NO[) <br />1 <br />9a. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will b�obtained: <br />TAAA/ 5 Poo rh T1tay� d 1A) of cc®.s roA x Fn o i® c: o L T® s rAne <br />GERUF16,0 Z46-0AArORY <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />W,Y6'Al rucAyA T&A/ is DETER ,4r ,a G 2 L•'� i r w&z ac BAci<Fllurp <br />C®17PACTCD-"®G®`® rY E VOM -17 AILi <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />)!I S G? L)E'9 A] PL A S TI C <br />b) What will be the final destination of the excavated stockpile? <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Name 44 N LE" y T -A 0 CJK /A14 Hauler Registration <br />city _5 c I?A Mg.'�e zip r acq <br />Phone No. ( 716 ) . 81 - 6 <br />EH 23 046 (Revised 08113199) Page 5 <br />W <br />I <br />