Laserfiche WebLink
ACKFILL EXCAVATION CERTIFICAT <br />Project Location OE30 V%C iOC3AD / OOH <br />Owner F [>®L dii'�'iZ F'/e[ 5ES 44C <br />Phone No. <br />Contractor P RADIS 6eyA&J_L_CAZ, Phone No.570- l 3 90 License No. `% 7 CPO <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12' lifts: <br />_ A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />Name(Print) <br />expep1rog <br />Title(Print) <br />* <br />Signature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />