Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br />been addressed for MARKS FUEL & FOOD INC as of February 14, 2018. <br />Open violations from September 14, 2017 inspection <br />Violation #211 - Designated operator employee training not performed or log not kept. <br />-The designated operator employee training for all employees was not current. The only employee listed on the <br />designated operator training log with current training was Janet Gonzalez. Ms. Gonzalez stated that she works from <br />6AM-2PM five days a week. Mr. Pahwa stated that the facility is open 24 hours a day. <br />-The training log did not list the hire dates of the employees. Ms. Gonzalez stated that she has worked for the <br />facility for exactly three years. <br />The designated operator shall train facility employees for which he or she is responsible in the proper operation and <br />maintenance of the UST system once every 12 months. The training shall include, but is not limited to: <br />1. Operation of the UST system in a manner consistent with the facility's best management practices <br />2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br />3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br />4. Name of the contact person(s) for emergencies and monitoring equipment alarms <br />Ensure that employees have been trained by the designated operator, maintain the list on site, and submit a copy of <br />the training records to the EHD. <br />Violation #314 - Failed to have secondary containment or secondary containment not tight. <br />The fuel filters in UDCs 1/2, 3/4, 5/6, and 7/8 are not contained within the secondary containment (under dispenser <br />containments) for the dispenser piping. All primary portions of the UST system must be provided with adequate <br />secondary containment. Immediately make all necessary alterations to provide secondary containment or meet all <br />applicable Title 23 requirements for a UST system, under permit and inspection of the EHD. <br />Open violations from September 22, 2016 inspection <br />Violation #107 - Plot plan/site map not submitted or failed to completely show where monitoring is <br />performed. <br />An accurate UST Monitoring Site Plan was not submitted that indicates the location of all monitoring sensors. A site <br />plan must be submitted identifying the locations where monitoring will be performed. Immediately log into the <br />California Environmental Reporting System (CERS) at http://cers.calepa.ca.gov/ and upload a copy of the UST <br />Monitoring Site Plan. <br />Violation #115 - Failed to inform the EHD of designated operator identification or change within 30 days. <br />The UST Designated Operator listed in CERS is not the Designated Operator (s) performing the UST Designated <br />Operator monthly inspections. Any changes shall be reported to the EHD within 30 days. Immediately log into the <br />California Environmental Reporting System (CERS) at http://cers.calepa.ca.gov and upload the notification <br />identifying all the designated operators for this facility. <br />Violation #121 - Failed to submit a written response within 30 days of receiving an inspection report. <br />An inspection was last done on September 28, 2015 and an inspection report was issued identifying information to <br />be submitted to bring this site into compliance. This information was required to be submitted by October 28, 2016. <br />This information has not been received resulting in a non-compliant status for this facility. An operator that receives <br />an inspection report shall have 30 days to submit a written response that includes a statement documenting <br />corrective actions taken or proposing corrective actions which will be taken. Ensure that a written response <br />documenting corrective actions taken or proposed is submitted within 30 days of receiving an inspection report. <br />Violations not resolved: <br />- HSC 25292.2 Current financial responsibility documents not submitted <br />- CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed <br />CCR 2715(a) Failed to inform the EHD of a change of designated operator within 30 days <br />Page 3 of 4 <br />