Laserfiche WebLink
T <br /> Page of <br /> a <br /> _ 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: p Piping Manufacturer 0 Industry Standard p Professional Engineer I <br /> i <br /> (I Other,(Sped) i <br /> Test Method Used: ®Pressure El Vacuum. ®Hydrostatic { <br /> El Other(Spec) [ <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"PSE 1 <br /> ftmmgmm <br /> Pip*Mg Material: ?t Fiberglass <br /> Piping Manufacturer: <br /> Piping Diameter: S 'r <br /> Length of Piping Run: © Feet Feet Feet Feet <br /> Product Stored- V p <br /> Method and location of Test Boot in Sump Test Boot in Sump Test Boot in Sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes j <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R.r): 5 PSI 5 PSI 5 PSI 5 PSI f <br /> _ 9 <br /> Test End Time: /47.10 2! /,0p4>7 <br /> Final Reading(RF): 5 PSI g PSI PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R�: PSI of PSI — PSI PSI <br /> Pass/Fail Threshold or 't <br /> Zero Zero Zero Zero <br /> Criteria: I } <br /> i Pass> Fail <br /> _Test:I�esuIt.-„ •r.,.,..:.:.. . ... �a s;"p,. e _ a I a.1.. <br /> COMMents—(include infaarnation on repairs made prior to testing:and recommended ollow-:r for failed tests) <br /> -� 5-,., z <br /> i <br /> I <br /> I <br /> II� <br /> - 1 <br /> i <br /> i <br /> i <br /> Chevy-on#96171 <br /> 56.33 Pacific Ave <br /> Stockton,Ca <br /> )8055 SB989 <br />