Laserfiche WebLink
9 t <br /> 1� <br /> t <br /> SS <br /> S <br /> Page of ' <br /> 7.UNDER-DISPENSER CONIAINMENT C TESTING <br /> Test Method Developed By: UDC Manufacturer ❑ Industry Standard 0 Professional Engineer ❑ <br /> Other(Spec) I <br /> Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic El ! <br /> Other(Spec) <br /> Test Equipment Used: Wayne Perry Inc.See Attached Testing Results Equipment Resolution: .00007 <br /> FOAM Uudex-Dispenser Containment NumberBelmv <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: V Zr <br /> .Height from UDC Bottom to Top . 19 . 5" 9. . u <br /> of Highest Piping Penett ation: <br /> Height from UDC Bottom to •• <br /> Lowest Electrical Penetration: S <br /> Condition of UDC prior to <br /> testing: Celt b,�t C,k <br /> t 2"Above Highest 2"Above Highest 2"Above Highest 2"Above Highest I <br /> PottionofUDC Iested Penetration Penetration Penetration Penetration <br /> Does turbine shut down whenj <br /> UDC sensor detects liquid. E Yes❑ No NAN ❑Yes(] No NASI Q Yes El No NA® 0 Yes Q No NA® — <br /> Turbine shutdown response time Q Yes E No NAM Q Yes[] No NAO ❑Yes E No NA® ❑Yes 0 No NAN <br /> Is system programmed for fail- ❑Yes 0 No NA® 0 Yes❑ No NA® ❑Yes❑ No NA® ❑Yes p No NAS E <br /> safe shutdown?* _ <br /> Was fail-safe.verified to be ❑Yes❑ No NAO ❑Yes❑ No NA® ❑Yes❑ No NA® ❑Yes❑No NA® <br /> operational?, <br /> Wait time between applying <br /> pressure/vacuutn/watei and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test <br /> Test Start Time: Z-3;P12233 / 5"7 I --r4 /.`/Z !:! <br /> Initial Reading(R�: �a.la f'O ,P4 Q.Pis$ / . P.zr,7 . <br /> Test End Time: Z 2�Yrr 72/ >// > Z 7 != 2 9 ° <br /> Final Reading(RF): e. .x5°2 ��� d yG �' �/ca Y Y5"?4> i <br /> Test Duration: 15 Min 15 Min 15 Kin 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(&-RD: <br /> Pass/Fail Threshold or Ctitetia: -0.0020 -0.0020• -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 j <br /> ......tip.;:,R a..,::: <br /> ss °< ;Pass ;Pass� aSs`; as �,'1'ass; Pass'`• '.Pass <br /> , !ss Q Fail., ❑.:Fail Q„'Fail ❑.FaiE: ❑ Fail:. Q `f;.: .'❑ Q` <br /> Fail."s',:. Fail .:. Fail <br /> Was sensor removed for testing? Yes❑ No NAE IR Yes Q No NAD 91 Yes 0 No NAE El Yes 0 No NAO <br /> Was sensor properly replaced and P <br /> JS Yes Q Na NAE Eff Yes FS <br /> vetified functional after testing? [I No NAE] Yes❑ No NAE) ®Yes El No NAE <br /> t <br /> Comments— ncltrde information on repairs madepilor to testing, andrecommended ollow-zi or failed tests <br /> Mevron#96171 <br /> 1633 Pacific Ave <br /> Stockton,Ca <br /> )8055 SB989 <br />