Laserfiche WebLink
Work Order: 2255571 <br /> F. Is-Tank-Gzugiiag/SIR Equipm-&-nt; Cllcck filin box if WA gwgin*9 4 <br /> ,8cd cel Finver-M-ycontW, <br /> 0 Clica-this Nm if m)tank gauging Or SIR cguil)Mcht Is Installed. <br /> This section must be completed if in-tank ganging equipment is used to perform leak dctwtion monitoring. <br /> Cum pletether"Ill in cbecklist: <br /> FU Yes U No* Has all input wiring been inspected for proper entry and lannimion,including testing Aw ground faulty <br /> LJ Yes 13 No* Were all tank gw&g probes visually inspected for damage and residue buildup? <br /> U Yes (3 NO' Was wamy of system prodadt level readings torted? <br /> U yes 0 NO' Was W=ncy of system water level rundirigs tested? <br /> Cl Yes LI No* Were all probes reinstalled properly? <br /> U Yes 12 No* Were�oll items�tm the equipment mamjjaLusW2;mkainm, checklist completed?I anc. <br /> *In the Section M.below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LL-D): 0 aveck this box if LLDs are not 111911101 <br /> Complete the JInflowigg checklist: <br /> Yes Fd—No* For cqt4nwm vArRW or anmxa equipaumt certification,%v leak simulated to veil I-LD performance? <br /> 0 N/A (Check all LW qy*)Simulated leak nft- 16 g.plL; Q 0.1 mg.0a ;0 02 gp.k <br /> Yes 0 NO* Were all LLDs confirmed opurationd and 10 within MPM'xy requiremeots? <br /> Yes 0 NO* Was the M-ft apparatus properly calibinteM <br /> *Adev— El Mt* For mechimical LI Ds dam the LID restrki <br /> J!I-N/A <br /> (3,Yes CI NO For electronic 1-1-13s,Ones the turbine short off if the LLD Actects a InA? <br /> 13 N/A <br /> '4 Sp <br /> product <br /> &w if it detects a le,*? <br /> —fi-dlY-W-ffiftb.LLD& <br /> Yes El No" For Unic LLE)s,does jiW�vzbm autoomacafty shut or if my <br /> Q N/A or di5comwdee portion of the mmwdng System is disabled <br /> RL Yes E3 No* For a oak LLD&does the nutomadeally shut cifff any Portion of the nXivAloring System maiMbOations <br /> O MA or&%uMV <br /> Yes 13 No* For a onk L.I.Dshasy"t all wiring been viscidly bepectoo <br /> Q NIA <br /> Yes <br /> tEl No*[Were all items.the equipment man imenance cheoldixt completed? <br /> In the Section E,below.describe how RW when dwe defiefeados were or tam be corrected, <br /> M. Comments: <br /> Pap 3 o€3 est <br /> Tanknology Inc. 8501 N.MoPac Expressway,Suite 400,Austin,Texas 78759 <br />