Laserfiche WebLink
F. lit 'Tank Gauging/SIR Effimment: )4 Check this box ifs gauging it,used only for inventory control. <br /> L] Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be Completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> U Yes Ll No* i Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U Yes Q No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> L3 Yes ❑ No* Was accuracy of system water level readings tested? <br /> Li Yes , L3 No* Were all probes reinstalled properly? <br /> 0 Yes Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): L3 Check this box if LLDs are not installed. <br /> Complete the folio ing checklist: <br /> Yes Q No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> U N/A (Check all that apply) Simulated leak rate: ld 3 g.p.h.; U 0.1 g.p.h; L3 0.2 g.p.h. <br /> )2f Yes U No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> A Yes 0 No* Was the testing apparatus properly calibrated? <br /> * For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ,@g—N/A <br /> M,Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> El N/A <br /> Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring, system is disabled <br /> U N/A or disconnected? <br /> Rk Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> U N/A or fails a test? <br /> Yes U No* For electronic LLDs,haveI all accessible wiring connections been visually inspected? <br /> E3 N/A <br /> jq Yes , Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />