My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} Onitoring System stem Certification <br /> Site Address: 6633 PACIFIC AVE Date of Testing/Service: 02/09/2009 <br /> @ BENJAMIN HOLT DR. <br /> F. In-Tank Gauging /SIR Equipment <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑x No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑x No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑x No. Was accuracy of system product level readings tested? <br /> ❑Yes ❑x No z Was accuracy of system water level readings tested? <br /> 171 Yes ❑x No• Were all probes reinstalled properly? <br /> Yes TEN, Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑x Yes ❑No* ❑N/A (Check all that apply)Simulated leak rate: x❑ 3 g.p.h❑0.1 g.p.h ❑0.2 g.p.h <br /> x Yes ❑No• Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> FX_ Yes ❑No• Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No- a N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑x Yes ❑No• ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑x Yes ❑No• ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> 0 Yes ❑No ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑x Yes ❑No• ❑N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> L'J Yes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.