My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIED PROGRAM CONSOLIDATED FOW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Chevron Station#96171 <br /> BUSINESS SITE ADDRESS 103. CTTy 104. <br /> 6633 Pacific Ave Stockton, CA 95207 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> byb the a ui ment manufacturers'instructions,or annual) ,whichever is more frequent.Such work must be erformed b ualified personnel.[23 CCR§2632,2634,238,264 11 <br /> _the ................................................................................._.._....._......................_-............._Y...................._.......................................................9....................................................................................1?.....................................Y..'#...........................P................__....._......................................_............................................................. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY El (Specify):99.OTHER 490-3490-3b. <br /> 6. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED490-4. <br /> [23 CCR§2632,26341 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHt* p(S) hat a k 111 <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder-Root 490-' MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 990- MODEL#(S): Liquid Sensor Series 794380-409 490-10. <br /> ......_............... _--........--_.._......................................................................................_............................_....._.__._....._.......... _................._................._......_..._._.................._..._........_.._..........._........_............................................................................................................_........._............_ <br /> ❑ . AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S). 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS .DAILY/NIGHTLY Lj c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERa90-1s. <br /> g.p.h. g.p.h. (Specify): 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> ........................................................................................................................................................... ...................................--.._.........._........................................................................................... . <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-22.n. <br /> .........................-.... ...._._............................................................................._.....................................................___..................._.._ ___....._.-.._.........._.............................................................................................................._.........490-23...... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS 490.24' <br /> Q ( Peci. a90-zs. <br /> ❑ 99.OTHER(Specify): 490-26. <br /> 490-27. <br /> ll <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) utk apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [21 CCR§2 36] SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ® c.PRESSURIZED [Id.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL#(S): quid Sensor Series 794380-208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34, <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> _......_....._..._._............................. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> 490-36, <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§236] <br /> MLLD MANUFACTURER(S): 490-3z MODEL#(S): 490-38. <br /> .............................................._._......................................__......_...............................--.._ ........_................................................................ ...._................ <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-0-0. MODEL#(S):PLLD Series 848480-003 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49044. <br /> ........................................._..........................................................................................__.._....................---..._...._..._.......--.........._.__...---' _..-_......................................_................................................................................................ <br /> ...................._..-' ......_....- -.......__.._......__._........._.......... <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 0-900-0746. <br /> .................................._.........................._................__......................._... --"- ....._._._....._......................................................................_.............._............................._..-._.._....._ <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> *Allowed for monitorin of unburied emer enc enerator fuel i in onl er HSC 25281.5 3 <br /> --....................-_..._...................._................................_.....---........................._...-.._............................._.........8.............................................Y........X..B...........................�.P_..B.-Y_�._._......._.._§.. --'- ')..)............_............. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§236(a)(3)] 490-50. <br /> ................................................................................................................................._......_.._.____... -..._-.............................._......................................................................................... <br /> .......__................:........---.._..............................._..._........_..._.........__.-.......-----._._.................................................................................... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ...............................................__..................................................................._.................__.....---.._.........................__._.......................................................................................................................... <br /> ❑ 99.OTHER(Specify) 490-53.-53. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.