My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:43:47 PM
Creation date
6/23/2020 6:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/01/8008 KOK 10t52 Fax 2® 3433 SZC IVSD Service Stat Sys- ty 121005/003 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans&applications as originals wiit be retained by EHp) <br /> t. Site map enclosed YES() No`& <br /> 2. 144anufacturer'3 spec 5119618 attached for all equipment to be installed YES[) Naf. - <br /> 3. Description of work to be completed(if a ding piping.UDQ%or other UST equipment,or performing tank top upgrade, <br /> use the UST Installation Applicstion ps as-8 as necessary for a timely pian review): <br /> 4, Description of equipment to be used(Attach draw)ngs/bll sprints as necessary): <br /> s: All equipment'is sts3te vellifled•or approved. YES j) ilioi j <br /> 6, Decontamination procedures: <br /> s.Will piping be decontaminated prior to removal? YES j] NO[] <br /> b. identify contractor performing decontamination: <br /> Name <br /> Address Phone(-„_j <br /> City` Tzip <br /> c. Describe method to be used for deeonlaiminatio; <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e. Rlnsate Hauler and permitted Treatment, Storage&Disposal Facility: <br /> Hauler Address am® -Phone( } _Hauler Reg#-- <br /> Petrtlifldd t}I I�ite Cily z <br /> 7. a. Describe the method that will be utilized to purge and/or inert the piping: <br /> b. Piping Hauler; <br /> Name Phone _ <br /> Address Oily <br /> Hauler Registration 9(if hauled as haTardous) Zip----C. Piping Disposal Site: <br /> Name _ <br /> Address Phone(—., _ <br /> EPA tb#(If transported to a permitt6d TSD fadiity) City Zip-_ <br /> 8. is the sampling firm an Independent Ihird party from the contractor? YES[] NO[] <br /> g. Describe,In detail,how the soil and/ru water sample(s)beneath the piping or dispenser wilt be obtained: <br /> 90. Handling of excavated soil(Contaminated Soil Hazardous Waste Haug): <br /> Name Hauler registration N` Phone <br /> Address City �" 4 per® <br /> b)If soil is not to be hauled,describe what will be done with if: <br /> 2 <br /> 600121 vAmciv OtI2TV n zero ZZS 5Z6 YVA Ob:60 6002/ZZ/ZO <br />
The URL can be used to link to this page
Your browser does not support the video tag.