My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:49:58 PM
Creation date
6/23/2020 6:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Garrett Backus [EH] <br /> From: Garrett Backus [EH] <br /> Sent: Thursday, December 13, 2012 1:14 PM <br /> To: 'Debbie Watts' <br /> Cc: Marty Weithman (martyw@servicestationsystems.com); Raymond von Flue [EH]; Kasey <br /> Foley [EH];Willy Ng [EH] <br /> Subject: 6633 Pacific Ave Chevron scope of work <br /> Hi Debbie, <br /> Can you update the SR0066189 scope of work for 6633 Pacific Ave, Stockton and send it to me? <br /> The tank#187 fill sump Veeder Root 208 sensor was replaced,not tank#2 as listed in the permit <br /> The Franklin Fueling 85010 stainless steel sleeve on tank#2 (87 product) was replaced today and the spill <br /> container was tested. <br /> The sleeve requires a permit since it is part of the spill container and is tightness tested along with the bottom <br /> plastic bucket portion. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.