My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:49:58 PM
Creation date
6/23/2020 6:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> t <br /> F.In-Tank Gauging/SIR Equipment: P Check this box if tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> C"' Yes (_ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> r Yes d" No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes r No* Was accuracy of system product level readings tested? <br /> Yes (' No* Was accuracy of system water level readings tested? <br /> r Yes i No* lWere all probes reinstalled properly? <br /> It-* Yes r No* Were all items on the equipment manufacturer?s maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> 6_ Yes No* For equipment start-up or annual equipment certification yy.was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rate: 3 g.p.h.; r 0.1 g.p.h; 1, 0.2 g.p.h. <br /> 170 Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> C Yes No* Was the testing apparatus properly calibrated? <br /> f Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> t+ Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> r N/A <br /> { Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> t° N/A <br /> r Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> C N/A <br /> f+ Yes r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.