My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:49:58 PM
Creation date
6/23/2020 6:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SWRCB,January 2002 Page of <br /> 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer RyIndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: gPressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Dial Gauge Equipment Resolution:0-15 psi <br /> Piping Run# 5-7 Piping Run# / Piping Run# Piping Run# <br /> Piping Material: <br /> ll <br /> Piping Manufacturer: '.. , <br /> Piping Diameter: -.3 ' <br /> Length of Piping Run: <br /> Product Stored: -'7 <br /> Method and location of <br /> Test boot in sump Test boot insump Test boot in sump Test boot in sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes j <br /> starting test: <br /> Test Start Time: j°_` `�-` <br /> Initial Reading(R;): <br /> Test End Time: e-" 2 r Z <br /> Final Reading(RF): 5 lo.5 <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: .8,Pass ❑Fail IT Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> i <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> i <br /> i <br /> Chevron#9-6171 <br /> 6633 Pacific Ave. <br /> Stockton,Ca 95207 <br /> SB 989 Dick Harvey <br /> #11061 <br />
The URL can be used to link to this page
Your browser does not support the video tag.