Laserfiche WebLink
r <br /> SWRCB,January 2002 Page of <br /> 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer RyIndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: gPressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Dial Gauge Equipment Resolution:0-15 psi <br /> Piping Run# 5-7 Piping Run# / Piping Run# Piping Run# <br /> Piping Material: <br /> ll <br /> Piping Manufacturer: '.. , <br /> Piping Diameter: -.3 ' <br /> Length of Piping Run: <br /> Product Stored: -'7 <br /> Method and location of <br /> Test boot in sump Test boot insump Test boot in sump Test boot in sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes j <br /> starting test: <br /> Test Start Time: j°_` `�-` <br /> Initial Reading(R;): <br /> Test End Time: e-" 2 r Z <br /> Final Reading(RF): 5 lo.5 <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: .8,Pass ❑Fail IT Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> i <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> i <br /> i <br /> Chevron#9-6171 <br /> 6633 Pacific Ave. <br /> Stockton,Ca 95207 <br /> SB 989 Dick Harvey <br /> #11061 <br />