My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:49:58 PM
Creation date
6/23/2020 6:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB January 2002 Page 7 of <br /> 8. FILL RISER CONTAIMAE NT SUMIP TESTING <br /> Facility is Not Equip ed With Fill Riser Containment Sumps ❑ <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer %fridustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum N?'Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:ELLDS Equipment Resolution: .0007 <br /> _ Fill Sump# 1--7- / Fill Sump# -g7-z Fill Sump# f I+ill Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Top of j <br /> Highest Piping Penetration: <br /> i <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested 2"above highest 2"above highest 2"above highest 2"above highest <br /> penetration penetration penetration penetration <br /> Sump Material: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: z-, 57 9.-05 <br /> Initial Reading(RI): f , `s f 5 3 ell 0 <br /> Test End Time: 9 9 c: - <br /> Final Reading(RF): G <br /> Test Duration: 15 minutes 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: 0.0020 0.0020 0.0020 0.0020 <br /> Test Result: CK Pass ❑Fail J&Pass ❑Fail 19 Pass ❑Fail ❑ Pass ❑Fail <br /> Is there a sensor in the sump? ❑-Ye"s ❑No B-es ❑No Comes ❑No ❑Yes ❑No <br /> Does the sensor alarm when <br /> either product or water is ❑Yes ❑No 0'1` A ❑Yes ❑No BNA ❑Yes ❑No O—NA ❑Yes ❑No ❑NA <br /> detected? <br /> Was sensor removed for testing? [mss ❑No ❑NA O es ❑No ❑NA EM6s ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ff'Ves ❑No ❑NA IJ-Yes ❑No ❑NA ayes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for-failed tests) <br /> Chevron#9-6171 <br /> 6633 Pacific Ave. <br /> Stockton,Ca 95207 <br /> SB 989 Nick Harvey <br /> #11061 <br />
The URL can be used to link to this page
Your browser does not support the video tag.