Laserfiche WebLink
Monitoring System Certification-Page 2 of 3 <br /> Site Address: 6633 Pacific Ave Date of Testing/Servicing: 12/13/12 <br /> D. Results of Testing/Servicing <br /> Software Version Installed 328.03 <br /> Com lete the following checklist: <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ® Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> ❑ N/A operational? <br /> ❑ Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ® N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? O Yes ❑ No <br /> © Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ® N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating properly.? If so,at what percent of tank capacity does the alarm trigger? 0 % <br /> ❑ Yes* 11 No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> a Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settfn s? Attach set-yreports,i a licable. <br /> a Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Monitor Certification performed for Permit Final due to replacement of 87-1 Fill Sump Sensor <br /> {L.8}. <br />