Laserfiche WebLink
1 <br /> 1. <br /> UNIIFUGROUNO TANK INSPECTION HiAlmll <br /> NEW INSTALLATION <br /> - e <br /> SITE NAME I NS PrCTI114'S NAML . <br /> AQ®REss� 2 •.3. /�D9.5�ir� c,Tx � z i P .�37 <br /> CONTRACTORt NAME. <br /> a3d1.92-� /ll.�irJ `.�r.�r t T.v�(� rELF.PNONE����(o�P•�� ,�n <br /> OWNER# NAME _TELEPHONE <br /> OIs- INSPIZTORIS <br /> OATP. APPROVE O APPROYCO INITIALS <br /> JM1 OR C22 1PHENT INSPECTED <br /> INITIAL INSPECTION <br /> Tank tested u wn deltveff jHnIlditylasteel) or all' at SPSI Milli <br /> P. Visual ins ectlon of Secondary containment. <br /> 1. Iauk ateru rIaIel v 1)laceJ wItb approved backfill. <br /> ;1,• •„ t. I. slumbers and tack capacities teco[deti <br /> PIPINC STATE INSPECTION <br /> t� Pressure test of P1111#14. Pr Twat and Secondary (NFI'A In)i <br /> 1'. Nall float values Installed. <br /> �1> Uverf I11 proles.t lon in%I al led• dens rltse: <br /> -' A- 100 3. 1 4.2 <br /> a tads <br /> b. Uncsed tank openings scaled and cathudlcally protected. <br /> Visual Ins ectlon of srruoJer containment nn L In r <br /> oImcc a be- 1 u rade• Ico-6 —other ptpo <br /> 1 P111 and vent et In <br /> 'Ought to xcadr. <br /> tl P[oduct line leak detector to place. Hard wired) <br /> -- V�_Appfoved tank leek montturinl device lnstetled. <br /> IU All aLvultced tlln and Ilttlu a ro e[i wrapped. <br /> IlI Pressure decoY test on cnwttele tank and rttducI, deliver system. I <br /> I i <br /> I <br /> FIm.m. tt:S'rCTI(4N <br /> • 1 y n. Prctlslon test suiit•ssluil ..•wula►rd al..l held in•les [eia•/vCd�j�s <br /> 1 pI 11 ptul cot tetu ,u 0•I 1 .I .• <br /> •r <br /> 1. Pelle•rmane.e Ic•.t ..1 nr.•►1111 •I..I.•. tte.n r'.vslcw. <br /> b. Pe•t l..e rater v t e•:I ••( et•.el.0 I I.o.• 1.•,I, .tet ea t nl. I IIvrJ wire-sip .._.y <br /> 1 Performance te::► of a.at► IIsm..u. m..o•I..Itn cI.•m t:l not tank(,,y{+�0�%LI <br /> A.) Points tIp operate6. <br /> ap Iteeti.•n ee.m.IMr. <br /> 7 Ac: able e o dk u s stew. <br />