Laserfiche WebLink
SEP -7-2006 08:18A FROM:D&SDRA INE SVC 2098268699 :4683433 P.5 <br />3WRCB, January 2002 Page of <br />9. SPELL/OVRRM-I, , rONTAINNT NT RnW.R <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: <br />pill -Bucket Manufacture Industry Standard Professional Engineer <br />.char-(SpectfA_ <br />Test Method Used: <br />Pressure Vacuum <br />Other (Specify) <br />Hydrostatic <br />Test Equipment Used: <br />Bucket Diameter: <br />Spill Box # 7 , Spill Boa <br />Equipment Resoluriow <br />spill Bax # <br />q <br />Spill Bax <br />Bucket Depth-., <br />Wait time- betweh applying <br />pressure/vacuum/water and <br />starting test: - <br />, �� ^ � `^ <br />r� ^ <br />`3� ,`,� <br />Test Start Time:. <br />Initial Reading (RO: <br />Test End Time: <br />Final Rending (RF): <br />Test Duraooh: * . <br />� l ^moo s <br />\f\.O <br />Change in Reading (RF -R4): <br />Pass/Fail Threshold or <br />Criteria: <br />Ack <br />AV <br />h'aii. n Fail <br />as Faila� <br />Fail <br />COmments — (include information on repairs made prior to testing, and recomnrended follow-up for failed tests) <br />r <br />