Laserfiche WebLink
ENVIROIkENTAL HEALTH%EPARTMENT <br />oPQ.uiN c <br />a ?� Donna K. Heran, R.E.H.S. <br />Director <br />Laurie A. Cotulla, R.E.H.S. <br />a�P Assistant Director <br />9�iF�R <br />August 24, 2006 <br />Greg Matas <br />Shields, Harper and Co. <br />2567 S. Sarah Ave. <br />Fresno, CA 93706 <br />Fax: (559) 266-5371 <br />SAN JOAQUIN COUNTY <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202-2708 <br />Telephone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Website: www.sjgov.org/ehd/ <br />Re: Country Mart <br />34243 S. Chrisman Rd. <br />Program Coordinators <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Jeff Carruesco, R.E.H.S. <br />Kasey Foley, R.E.H.S. <br />The revised scope of work for the permit to repair UDCs 3/4, 5/6, 9/10, 11/12, 14 and 14 <br />satellite at the above referenced site has been approved with the following additional <br />conditions. <br />1. Contact the local fire department and San Joaquin Valley Air District for any <br />applicable permits. <br />2. All fittings must be certified by an independent testing organization and labeled as <br />required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See Title 23 <br />Chapter 16 Table B for complete list) and shall be installed per the manufacturers' <br />installation instructions. <br />3. EHD must witness the functionality of the monitoring system to ensure that <br />monitoring meets the requirements of California Code of Regulations Title 23 and <br />the Health & Safety Code. Contact EHD for the following inspections (Allow a <br />48 hour notice for all inspections): <br />a. Testing of all replaced sensors. <br />b. 24 hour or equivalent lake test on all repaired UDCs. <br />4. Once concrete is poured all lines shall have an integrity test performed in <br />accordance to manufacturer. Results must be received by EHD within 7 days of <br />returning the site to operating condition. <br />5. If concrete is broken near the underground storage tanks they must be have an <br />integrity test performed once concrete is poured in accordance to manufacturer <br />guidelines. Results must be received by EHD within 7 days of returning the site to <br />operating condition. <br />Contact me at (209) 468-3448 with any questions or to schedule the inspection at the <br />above listed site. <br />Thank you, <br />Willy Ng, S <br />Senior Registered Environmental Health Specialist <br />