Laserfiche WebLink
Project Location <br />0 0 <br />BACKFILL EXCAVATION CERTIFICATE <br />Owner C elf Fr E -D C- 2- 00_5 Phone No. Z 13 - %z 3 - -?q76 *�FS-cc <br />Contractor C N r7r7r�) Phone No. 5Z2-- 49 3 54G License No. -73 (_ Z ( 9 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />— A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 da s of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* DoT _3/ <br />Name (Print) <br />* V ic?=_- Pkt=-, <br />e(Print <br />* <br />—signature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />