My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
34243
>
2300 - Underground Storage Tank Program
>
PR0231801
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 9:10:07 AM
Creation date
6/23/2020 6:52:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231801
PE
2361
FACILITY_ID
FA0003290
FACILITY_NAME
COUNTRY MART GAS & FOOD
STREET_NUMBER
34243
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304-9334
APN
25318004
CURRENT_STATUS
01
SITE_LOCATION
34243 S CHRISMAN RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231801_34243 S CHRISMAN_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,06-28-'10 14:13 FROM-West Star Envmt Inc. +559-277-0106 T-708 P0005/0007 F-325 <br /> F. 1'n-Tank Gauging/SIR 5Went: Auhect this box it' ugmg is usea duty ror mven6Ury s:UuuV,. <br /> ❑ Check this box if AW gauging or Slit,equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the f n checklist: <br /> ®Yes ❑ No* as ut wiring been inspected for proper termination,me u ing testing or ground au ts? <br /> ❑ Yes No- Were all tank ga es v" mspecled for damage and residue buildup? <br /> [TYFs--_Olio$ Was accuracy of sys uc "n s tests ? <br /> ❑ es 0 No* as ac2LNp,91system water level readings tests <br /> YesNox W probes reinstalled roperly? <br /> estN e ere all items on the equipment manufacturer's maintenance c ec list completed? <br /> G. Line Leak Detectors.eLLD): ❑ Check this box if LLDs are not installed. <br /> Cam lets the foll ing checklist: <br /> Yes ❑NO, For equipment start-up or annual equipment certification,was a leak simWatsd to verify LLD performance? <br /> ❑N/A (Check all that aPPIY)simulated leak rate: 3 g p.h.; ❑0.1 g.p h. [:10.2 g p.h. <br /> Yes ® N®' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Wes No" Was the testin a aratus J)roDerliy calibrated? <br /> Yes El ° For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> Yes °x For electronic LLDs,does the turbine automatically shut off if the LM detects a leak? <br /> N/A <br /> Yes RO" For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A icco ected? <br /> Yes No" For electronic LLDs,does the turbine automatically shut off if any portion o a monitoring system malfunctions <br /> 11 N/A or fai a <br /> ❑Yes N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes Na' ere a items on the equipment man attune s maintenance aeck ist comp eted? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Pagel off a3roe <br />
The URL can be used to link to this page
Your browser does not support the video tag.