My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Myo. <br /> Iff 1.CONTINUOUS ELECTRONIC MO, pTORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: 1/�1�0�— ��� Mst. MODEL#: 7L.-5 -3-56 Msz• <br /> LEAK SENSOR MANUFACTURER:Vi10L+r— chi M53 MODEL#(S): 2 U M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 'f a_YES ❑ b.NO M57. <br /> ❑ 2_MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: Mss. MODEL#(S): M59. <br /> 3.VISUAL MONITORING DONE: is a.DAILY ❑. b.WEEKLY(Requires agency appmval) M60. <br /> ❑ 4.NO DISPENSERS <br /> ❑ <br /> 99.OTHER(Specify) M61. <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70- <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mso. <br /> 1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. El OTHER(Specify): Msi. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> • The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> NMMMNr <br /> Pease �s section to'nclude any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> AS OF 1/1/05,THE"DESIGNATED UST OPERATOR"IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION—. <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR f 2715 b. <br /> MINIMUM <br /> CER ICATIO :I ce the information provided herein is true and accurate to the best of my knowledge. <br /> O RA SIG REPRESENTING DATE: M91 <br /> j <br /> E]owner M9o. p�� 147 <br /> ❑Operator I ! <br /> O R/OPERATOR (print): M92. WNER/OPERATOR rTI'TL • M93. <br /> �y ae. <br /> .- idf'Z�tb� I�i <br /> (Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.