Laserfiche WebLink
1 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN IN 2.CHANGE OF INFORMATION Mol• <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. `` M02• <br /> (Check one item only) THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S):. ®®® C.► ®L�� <br /> FACILITY ID#(Agency Use Only) <br /> /v <br /> FACILITY NAME M r G„/ e "rr e,-10/ 6' 6 c. M03. <br /> FACILITY SITE ADDRESS , �'® ,O1 CC, 6c, ® A & M04 CITY f-r-6 C Mos. <br /> State law requires that testing,preventive maintenance,aTcafiibra�fiion of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06- <br /> accordance with the equipment manufacturers'instruction, ally,whichever is more frequenk Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED Ig I.ANNUALLY ❑ 99.OTHER(Specify): M07• <br /> This monitoring plan must include a Site.Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have.a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan m etc.)which shows all required information,include it with this clan. <br /> MONITORING IS.PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10• <br /> I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT 1�: .a..DRY ❑ b.LIQUID FILLED ❑..c.UNDER PRESSURE [j d.UNDER VACUUM M11- <br /> PANEL MANUFACTURER: <br /> ll- <br /> PANELMANUFACTURER: -Pti Mt2. MODEL#: --r LL M13• <br /> LEAK SENSOR MANUFACTURER: Ve, ®/` !" M14. MODEL#(S): `1 LCY MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(SS) <br /> PANEL MANUFACTURER: M16. MODEL#: Mn. <br /> IN-TANK PROBE MANUFACTURER: M"- MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑. a..CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY NCO- <br /> d.MONTHLY ❑.e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1.g.p.h. ❑ b..0.2 g.p.h. ❑ c.OTHER(Specify): M21 M23. <br /> ❑.3..INVENTORY RECONCILIATION ❑ &MANUAL PER 23 CCR§2646 ❑ b..STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑.a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): Mz6. M27. <br /> 6.VISUAL MONITORING DONE: 9a.DAILY ❑..b.WEEKLY(Requires agency approval) <br /> ❑ <br /> 99.OTHER(Specify): Meg <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30• <br /> jo 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: .a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: Vf l jl r } M32. MODEL#: -rt 3,5 M33. <br /> LEAK SENSOR MANUFACTURER: W4444C M34. MODEL#(S): 200 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? jo a.YES ❑ b.NO M36. <br /> WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? S a.YES ❑ b.NO M37- <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF . <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED c <br /> MLLD MANUFACTURER(s): P,E V1 t r® M38. MODEL#(S): J I P - i�'1 L� - ® M39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Mao• MODEL#: M41 <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g,p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h, M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ &.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> .Requires agency approval "Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(6)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M49. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />