Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br />U Check this box if no tank gauging or SIR equipment is irtsulled. <br />MOMMUT♦Vi I 1il AU1 577N, I M-1,74 M - 0 0 11: aal 4 11 t am "I <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />F5 I �ID7611= 01�� <br />- ---- ------ <br />0 the following checklist: <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: IM 3 gp.h.; 0 0. 1 gp.h U 0.2 g.p.h. <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak -9. <br />For electronic LLDs, does the turbine automatically shut off it the LLD detects a leak? <br />Ps <br />17 '17M, M-17 T M M qVion or -tie monitoring system is OEM, <br />or disconnected? <br />e <br />F <br />IIR <br />ITUTLE MoMaTcHily • T'_Cjr portion UME momforing system 11/ •/ <br />i or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ <br />Were all items on the equipment r s maintenance checklist completed? <br />In the <br />Section MF <br />rlow, describe how and when these deficiencies were or wiH be corrected. <br />H. Comments: <br />— <br />L L <br />Page 3 of 3 03/01 <br />