My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2002-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 10:16:48 AM
Creation date
6/23/2020 6:52:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2008
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2002-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> Features <br /> • Automatic Business Inventory • Ethernet/IP Communications <br /> Reconciliation • Internal Auto-Dial Fax <br /> • AccuChart TM Automatic Tank (SiteFaxT"')/modem <br /> Adjusted Delivery Reporting Calibration communications <br /> Adjusted delivery reporting ensures that you • Automatic Tank-To-Meter • Optional Integral Printer or <br /> get what you pay for. When a bulk delivery Mapping Remote Printer Interface <br /> is made, the TLS-350R measures the amount • 0.1 GPH and 0.2 GPH In-Tank • Emergency generator applications <br /> of any fuel dispensed during the delivery and Leak Detection with Magnetostric- selectable via programming <br /> provides a report showing the volume tine Probes • One system handles mix of <br /> increase, the amount of fuel dispensed during . Electronic Line Leak Detection standard and emergency generator <br /> the delivery and the actual delivery amount. Capabilities tanks <br /> Periodic Variance Thresholds • Inventory Monitoring and • Records generator activity <br /> The TIS-3508 automatically calculates Reporting • Complete inventory reports before <br /> periodic variance thresholds based on the U.S. • Interstitial/Sump Leak Sensing and after generator operation <br /> E.P.A. requirement of +/-(1"%o of monthly Capabilities • Audible and Visual Alarm <br /> throughput +130 gallons) and includes the • Vapor Well Monitoring Capability Capabilities <br /> variances on a Periodic Reconciliation . Groundwater Monitoring • Monitors up to 12 tanks <br /> Report.The variance threshold is programmable Capability <br /> so it can be set to local regulations if necessary: p y Maximum Tank Capacity: 15,000 <br /> • Input/Output.Capability Gallons; 37,000 gallons with <br /> • Sum and Dispenser Monitoring CSLD software enhancement <br /> The TLS-3508 is available with an integral p p b <br /> printer or can be connected to a remote Capabilities • Leak Testing and Reconciliation <br /> printer. The system can be programmed to • RS-232 Data Communications for Manifolded Tanks <br /> generate reports at the end of a shift ,day; or <br /> period.Periodic reports are programmable <br /> to cover up to a 35-day cycle and can print Standard Models <br /> in either column (summary) or row (line Console Form Number: 848290-102 <br /> item)formats. Description: TLS-350R Console without Integral Printer <br /> Console Form Number: 848290-122 <br /> Description: TLS-350R Console with Integral Printer <br />
The URL can be used to link to this page
Your browser does not support the video tag.