Laserfiche WebLink
03/01 <br /> Monitoring System Certification <br /> D. Results of Testing/Servicing r, � <br /> Software Version Installed: V a 0 � 1-0 ( � z�(.0 �' <br /> Complete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> Yes ❑ No* Is the visual alarm o erational? <br /> Yes ❑ No* Were all sensors visual!X inspected, functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ! N/A operational? <br /> ` es ❑ Nu* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment 1 <br /> ElN/A monitoring system detects a leak, tails to operate, or is electrically disconnected? If yes: which sensors initiate I� <br /> positive shut-down? (Check all that apply) � urnp/'1'rcnch Sensors;re Dispenser Containment Sensors. I� <br /> ii Did you confirm positive shut-down due to leaks and sensor failtlreldiSCUnneCtiOn? Yes; ❑ No. <br /> C1 Yes ❑ No* for tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audiblee the tank <br /> fillpoint(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm tri er? 4- % <br /> Yes* ,>�' No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement 2arts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitorina system set-up reviewed to ensure pro2er settin s?Attach set up reports, if applicable <br /> Yes ❑ No* Is all monitoring a ui mentoperational 2er manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />