Laserfiche WebLink
• <br />• Page 6 of 6 <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer X _ 3 ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hy&wtat e <br />❑ Other (Spec) <br />Test Equipment Used: <br />Spill Box # diesel 1 <br />Equipment Resolution: <br />0.0000" <br />Bucket Diameter: 12" <br />Bucket Depth: 12" <br />Wait time between applying <br />pressure/vacuum/water and 15 Minutes <br />starting test: <br />Test Start Time: 8:44 / 9:00 <br />Initial Reading (RI): 4.529 / 4.529 <br />Test End Time: 8:59 / 9:15 <br />Final Reading (RF): 4.529 / 4.529 <br />Test Duration: 15 min. <br />Change in Reading (RF-RO: 0/0 <br />Pass/Fail Threshold or 0 <br />Criteria: <br />Test Result. X Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Hydrostatic Test Performed Twice To Ensure Testing Results. <br />