My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Page of <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer X Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Uses: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec) <br />Measuring Equipment Used for Testing: INCON TS -STS V2.1 <br />UDC # Disp 01 UDC # UDC # <br />UDC Manufacturer: Total Containment <br />UDC Material: <br />Plastic <br />UDC Depth: <br />30" <br />Height from UDC Bottom to <br />8" <br />Highest Piping Penetration: <br />Height from UDC Bottom to <br />12" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Dry / Dirty <br />testing: <br />Portion of UDC Tested. <br />2" Past highest piping <br />penetration <br />Does turbine shut down when <br />UDC sensor detects either <br />Yes <br />product or water? <br />Turbine shutdown response <br />4 Sec. <br />time. <br />Is system programmed for fail- <br />Yes <br />safe shutdown? <br />Was fail-safe verified to be <br />Yes <br />operational? <br />Wait time between applying <br />15 Min <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />10:27 / 10:43 <br />Initial Reading (RI): <br />4.796 /4.796 <br />Test End Time: <br />10:42 /10:58 <br />Final Reading (RF): <br />4.796 / 4.796 <br />Test Duration: <br />15 Min. <br />Change in Reading (RF -RI): <br />.000/.000 <br />Pass/Fail Threshold: <br />.002 <br />Test Result: <br />Pass <br />Was Sensor removed for <br />Yes <br />testing? <br />Was Sensor properly replaced <br />Yes <br />after testing? <br />Comments — (include information on repairs made to facilitate a passing test and indicate whether a <br />permit was obtained for the repairs) <br />All hydrostatic test performed twice to insure testing results <br />Note: Hydrostatic testing of the UDC should, at a minimum, provide for a liquid level that tests to <br />the highest point of piping projection into the containment vessel. <br />nnTTO'r 9 T L-11AA1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.