My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 <br />6O <br />EraVirdCP"MMen teal <br />Environmental Health Department <br />San Joaquin County <br />600 East Main Street <br />Stockton, Ca. 95202 <br />Ref: Unified Western Grocers, 1990 Piccoli Street, Stockton <br />Page 1 of 1 <br />This letter is a brief description of the scope of work to be conducted at the above <br />referenced location <br />SCOPE OF WORK <br />1. Collect the required permits <br />2. Saw cut around existing spill bucket <br />3. Jack hammer and remove concrete from around spill bucket <br />4. Remove spill bucket <br />5. Install a new OPV' A.5 gallon spill bucket <br />6. Pour new concrete around new spill bucket <br />7. Test the tank using the existing Veeder-Root monitoring system that meets the <br />required .01 testing requirements <br />NOTE: if the existing Veeder-Root will not complete the required tank testing a third party <br />StIC tank tester will complete the required testing <br />Asa Cosby <br />Presedent <br />Astor lid.*--.--- ul_.a ♦ 1 a)AKnom ".1- ._..:a., n..l:e ....:.. n'1rst9% /nnn\ LOl AHAO <br />
The URL can be used to link to this page
Your browser does not support the video tag.