My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Monitoring Site Plan <br /> Site Address : 1990 Piccoli Road,Stockton,95215 p r'r <br /> �"Es <br /> 0 PA <br /> a}} to Grocers: 1` � � , Y <br /> st, don 1 ,. <br /> 1990 Piccof Rand <br /> I <br /> Wash Bay r <br /> Mechaftc Shop <br /> I <br /> t <br /> U <br /> "sel US re � piBucket <br /> T�: ie <br /> ,\\,t 1 1 <br /> Ll <br /> T.S. n r L2 STP SWV B STP Sump(High Flow) <br /> Date map was drawn: 11/18/2014 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment, if <br /> installed: monitoring system control panels; sensors monitoring tank annular spaces,sumps,dispenser pans,spill containers, or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(ifused for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.