Laserfiche WebLink
UST Monitoring Site Plan <br /> Site Address : 1990 Piccoli Road,SwcktoR 95215 <br /> Unified Grocers <br /> Stockton,GA. <br /> 1990 Piccoli Road <br /> I <br /> I <br /> Wash Bay r • - J <br /> Mechanic Shop <br /> . J <br /> a <br /> TLS-35Q <br /> D <br /> Direct Bury Spill Bucket <br /> T1:Diesel US <br /> L1 Annular--7L3 STP Sump(High Flow) <br /> N.T.S. L2 STP Sump <br /> Date map was drawn: 11/25/2013 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification.On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment, if <br /> installed:monitoring system control panels;sensors monitoring tank annular spaces,sumps,dispenser pans,spill containers,or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />