My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:39:37 PM
Creation date
6/23/2020 6:52:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231820_1990 N PICCOLI_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Page 6 of 6 <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer X Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Bucket Diameter: <br />Equipment Resolution: <br />Spill Boz # diesel 1 <br />12" <br />0.0000" <br />Bucket Depth: <br />12" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes <br />Test Start Time: <br />8:44 / 9:00 <br />Initial Reading (RI): <br />4.529 / 4.529 <br />Test End Time: <br />8:59 / 9:15 <br />Final Reading (RF): <br />4.529 /4.529 <br />Test Duration: <br />15 min. <br />Change in Reading (RF -RI): <br />0/0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />Test Result: <br />X Pass ❑ Fail <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Hydrostatic Test Performed Twice To Ensure Testing Results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.